First of all the sole plate is laid onto the low level masonry. Discrepancies in level are sorted by using plastic shims to bring the sole plate up to the highest level.Once this is in place the insulated panels fit together just like a puzzle. Each is numbered and are assembled to the instruction drawings of the supplier, Glosfords. The panels are literally stuck together with glue which creates an airtight seal. It all happens extremely quickly with brief pauses to fit lintel beams over windows. The internal walls arrive already assembled and are just fitted into place.
We finish the week with the lower ground floor completed, the ground floor and some of its walls in place.
No comments:
Post a Comment